[jboss-jira] [JBoss JIRA] (WFLY-8204) work-manager and distributed-workmanager need an Elytron-enabled flag
Stefano Maestri (JIRA)
issues at jboss.org
Wed Feb 22 09:11:00 EST 2017
Stefano Maestri created WFLY-8204:
-------------------------------------
Summary: work-manager and distributed-workmanager need an Elytron-enabled flag
Key: WFLY-8204
URL: https://issues.jboss.org/browse/WFLY-8204
Project: WildFly
Issue Type: Bug
Reporter: Stefano Maestri
Assignee: Jason Greene
Priority: Blocker
2 RA using the same bootStrapContext and so the same WorkManager. First RA has ElytronEnabled==true, while the second one has ElytronEnabled==false. We have a problem in this line:
https://github.com/wildfly/wildfly/blob/master/connector/src/main/java/org/jboss/as/connector/services/resourceadapters/deployment/AbstractResourceAdapterDeploymentService.java#L676
When second RA will be deployed it will find security integration set for elytron not according to its configuration. And, since this method is changing securityIntegration on a deployment it would be a problem every time we have mixed configuration w/ and w/o Ely.
I think we should have elytron-enabled parameter also in workmanager/default-workmanager in jca subsytem and a check (in the method linked above and/or maybe elsewhere...I need to double check) that RA w/ elytron-enabled use only workmanager w/ elytron-enabled and vice versa.
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
More information about the jboss-jira
mailing list