[jboss-jira] [JBoss JIRA] (WFLY-7930) Upgrade IronJacamar to 1.4.1 from 1.4.0
Kabir Khan (JIRA)
issues at jboss.org
Fri Jan 20 15:32:00 EST 2017
[ https://issues.jboss.org/browse/WFLY-7930?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Kabir Khan moved JBEAP-8426 to WFLY-7930:
-----------------------------------------
Project: WildFly (was: JBoss Enterprise Application Platform)
Key: WFLY-7930 (was: JBEAP-8426)
Workflow: GIT Pull Request workflow (was: CDW with loose statuses v1)
Component/s: JCA
(was: JCA)
> Upgrade IronJacamar to 1.4.1 from 1.4.0
> ---------------------------------------
>
> Key: WFLY-7930
> URL: https://issues.jboss.org/browse/WFLY-7930
> Project: WildFly
> Issue Type: Component Upgrade
> Components: JCA
> Reporter: Kabir Khan
> Assignee: Stefano Maestri
>
> This is needed to adjust the SPI needed for the Elytron integration for the three JCA subsystems
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
More information about the jboss-jira
mailing list