[jboss-jira] [JBoss JIRA] (WFCORE-2746) Move elytron management security tests from core to full
Brian Stansberry (JIRA)
issues at jboss.org
Tue May 2 15:36:00 EDT 2017
Brian Stansberry created WFCORE-2746:
----------------------------------------
Summary: Move elytron management security tests from core to full
Key: WFCORE-2746
URL: https://issues.jboss.org/browse/WFCORE-2746
Project: WildFly Core
Issue Type: Task
Components: Domain Management, Security, Test Suite
Reporter: Brian Stansberry
Since until recently the elytron subsystem wasn't part of the core feature pack, a lot of integration tests of its use ended up in the WildFly full testsuite instead of in core. This task is to get tests that are only testing core functionality moved into the core testsuite. Because that's the right thing to do, but also because it's useful in practice by eliminating a cause for messy coordinated changes to core and full such that code changes in core can be tested.
There are a number of aspects to this, for which I'll create subtasks.
Following is an initial list of tests that should be moved. *This is meant to be a living list, with things added as they are noticed.* So anyone should feel free to edit this JIRA description to add things to the list.
org.jboss.as.test.integration.security.perimeter.*
org.jboss.as.test.manualmode.mgmt.elytron.HttpMgmtInterfaceElytronAuthenticationTestCase
org.jboss.as.test.integration.domain.AbstractSlaveHCAuthenticationTestCase and subclasses.[1]
[1] One subclass of this is not related to elytron but should be moved to core too. I haven't looked closely but it uses vault, which may be why it is in full. But we can use vault in the core testsuite now.
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
More information about the jboss-jira
mailing list