[jboss-jira] [JBoss JIRA] (WFLY-8866) Legacy add-protocol/remove-protocol operations do not work for legacy protocols

Paul Ferraro (JIRA) issues at jboss.org
Wed May 31 12:20:02 EDT 2017


     [ https://issues.jboss.org/browse/WFLY-8866?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Paul Ferraro moved JBEAP-11255 to WFLY-8866:
--------------------------------------------

        Project: WildFly  (was: JBoss Enterprise Application Platform)
            Key: WFLY-8866  (was: JBEAP-11255)
       Workflow: GIT Pull Request workflow   (was: CDW with loose statuses v1)
    Component/s: Clustering
                     (was: Clustering)


> Legacy add-protocol/remove-protocol operations do not work for legacy protocols
> -------------------------------------------------------------------------------
>
>                 Key: WFLY-8866
>                 URL: https://issues.jboss.org/browse/WFLY-8866
>             Project: WildFly
>          Issue Type: Bug
>          Components: Clustering
>            Reporter: Paul Ferraro
>            Assignee: Paul Ferraro
>            Priority: Blocker
>
> As discussed in JBEAP-11190, this concerns the following use case:
> {noformat:title=#4 Adding TCPPING via add-protocol operation - NOK}
> /subsystem="jgroups"/stack="tcpping":add-protocol(type="TCPPING")
> # throws with DR19
> {noformat}
> which no longer works in DR19 because it requires socket bindings to be defined.



--
This message was sent by Atlassian JIRA
(v7.2.3#72005)


More information about the jboss-jira mailing list