[jboss-jira] [JBoss JIRA] (WFLY-9420) Cluster partitions can take cca 2 minutes to merge
Radoslav Husar (JIRA)
issues at jboss.org
Thu Oct 5 11:35:00 EDT 2017
[ https://issues.jboss.org/browse/WFLY-9420?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Radoslav Husar updated WFLY-9420:
---------------------------------
Summary: Cluster partitions can take cca 2 minutes to merge (was: Cluster partitions can take up to 2 minutes to merge)
> Cluster partitions can take cca 2 minutes to merge
> --------------------------------------------------
>
> Key: WFLY-9420
> URL: https://issues.jboss.org/browse/WFLY-9420
> Project: WildFly
> Issue Type: Bug
> Components: Clustering
> Affects Versions: 11.0.0.CR1
> Reporter: Radoslav Husar
> Assignee: Radoslav Husar
> Labels: partition_handling
>
> Using the {{MERGE3}} protocol, it can take significantly longer than {{max_interval}} for merge to happen.
> The info sender interval is up to 45 seconds
> {code:java}
> public long nextInterval() {
> return Math.max(min_interval, Util.random(max_interval) + max_interval/2);
> }
> {code}
> and the view consistency checker interval is 48 seconds
> {code:java}
> protected long computeCheckInterval() {
> return (long)(max_interval * 1.6);
> }
> {code}
> which depending on the timing can take significant amount of time.
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
More information about the jboss-jira
mailing list