[jboss-jira] [JBoss JIRA] (SWSQE-120) Integrate Test Mesh Job into Pipeline
Hayk Hovsepyan (JIRA)
issues at jboss.org
Mon Apr 9 07:00:02 EDT 2018
[ https://issues.jboss.org/browse/SWSQE-120?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Hayk Hovsepyan resolved SWSQE-120.
----------------------------------
Resolution: Done
Integrated here http://jenkins2.bc.jonqe.lab.eng.bos.redhat.com:8080/job/Istio-and-Kiali-on-Openshift
> Integrate Test Mesh Job into Pipeline
> -------------------------------------
>
> Key: SWSQE-120
> URL: https://issues.jboss.org/browse/SWSQE-120
> Project: Kiali QE
> Issue Type: Sub-task
> Reporter: Hayk Hovsepyan
> Assignee: Hayk Hovsepyan
>
> http://jenkins2.bc.jonqe.lab.eng.bos.redhat.com:8080/job/Kiali-Test-Mesh/
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
More information about the jboss-jira
mailing list