[jboss-jira] [JBoss JIRA] (WFLY-10228) Upgrade Picketlink Bindings from 2.5.5.SP10 to 2.5.5.SP11
Paul Gier (JIRA)
issues at jboss.org
Thu Apr 19 09:55:00 EDT 2018
[ https://issues.jboss.org/browse/WFLY-10228?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Paul Gier reassigned WFLY-10228:
--------------------------------
Assignee: Vladimir Dosoudil (was: Paul Gier)
> Upgrade Picketlink Bindings from 2.5.5.SP10 to 2.5.5.SP11
> ---------------------------------------------------------
>
> Key: WFLY-10228
> URL: https://issues.jboss.org/browse/WFLY-10228
> Project: WildFly
> Issue Type: Component Upgrade
> Components: Build System
> Reporter: Lin Gao
> Assignee: Vladimir Dosoudil
> Labels: downstream_dependency
>
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
More information about the jboss-jira
mailing list