[jboss-jira] [JBoss JIRA] (DROOLS-2845) Extend the existing verifier to support DMN tables
Toni Rikkola (JIRA)
issues at jboss.org
Tue Aug 7 04:44:00 EDT 2018
[ https://issues.jboss.org/browse/DROOLS-2845?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Toni Rikkola updated DROOLS-2845:
---------------------------------
Summary: Extend the existing verifier to support DMN tables (was: Extend the existing verfier to support DMN tables)
> Extend the existing verifier to support DMN tables
> --------------------------------------------------
>
> Key: DROOLS-2845
> URL: https://issues.jboss.org/browse/DROOLS-2845
> Project: Drools
> Issue Type: Epic
> Components: DMN Editor, verifier
> Reporter: Toni Rikkola
> Assignee: Toni Rikkola
> Labels: drools-tools
>
> h1. Goal
> Reuse the V&V created for Guided Decision Tables on the DMN tables.
> h1. Workload divided to steps
> I propose the work goes in the following steps. After each step I should be able to merge into master.
> Steps:
> # Move Verifier core to kie-wb-common
> # Move V&V reporting UI to kie-wb-common
> # Make the web worker connector reusable for different V&V types
> # Make a servlet module for DMN that allows the download of the Web Worker.
> # Create an adapter for DMN tables
> # Add support for ranges ( these are given in DMN so no need to use JSR303 )
> # Duplicate i18n of the V&V for DMN or unify the reports so that the terms make sense
> h1. Time and risks
> h2. #1, #2, #3, #4 and #7 moving, copying code or doing refactoring
> Most of the work items are just about moving, copying code or doing refactoring. These are easy to estimate and I think they are doable in one sprint along with everything else I do. Already started few of these so it is easier for me to estimate how long they take.
> h2. 5. Create an adapter for DMN tables
> Adapters job is to take the model ( DMN or dtable ) and tear it down into smaller bits that the Verifier actually inspects. The core Verifier basically only sees rules or rows as collections of conditions and actions. This is why I feel once the adapter is done, the verifier will automatically work for DMN tables. This adapter also keeps track of the cell to action/condition connections.
> This area is where most of the work is that is hard to estimate, since there is some unknowns here. In theory DMN adapter is a lot easier to do than the DTable adapter was. Due to the unknown I will have to say 3 weeks.
> h2. 6. Add support for ranges
> Mario helped to get the range checks in order. The V&V now works with unlimited ranges, but adding known range limitation is in a way just about adding in the data of a mock rule that checks for the area that is outside of the range. I’ll play it safe here and say one week, but at the moment this feels really easy.
> h1. Just to make it clear
> This work only targets the DMN table in the similar format that it is in the Guided Decision Table. So it does not cover a Verification of the entire DMN diagram that can have several tables that possibly complete each other. We have the same situation if we have multiple DRL Tables in a ksession.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
More information about the jboss-jira
mailing list