[jboss-jira] [JBoss JIRA] (SWSQE-343) Adjust Pipeline to install Istio 1.0.0 upstream

Guilherme Baufaker Rêgo (JIRA) issues at jboss.org
Wed Aug 8 20:50:00 EDT 2018


     [ https://issues.jboss.org/browse/SWSQE-343?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Guilherme Baufaker Rêgo resolved SWSQE-343.
-------------------------------------------
    Resolution: Done


> Adjust Pipeline to install Istio 1.0.0 upstream
> -----------------------------------------------
>
>                 Key: SWSQE-343
>                 URL: https://issues.jboss.org/browse/SWSQE-343
>             Project: Kiali QE
>          Issue Type: Sub-task
>            Reporter: Hayk Hovsepyan
>            Assignee: Guilherme Baufaker Rêgo
>




--
This message was sent by Atlassian JIRA
(v7.5.0#75005)



More information about the jboss-jira mailing list