[jboss-jira] [JBoss JIRA] (WFLY-6847) Lost large messages if backup is shutdown during synchronization
ehsavoie Hugonnet (Jira)
issues at jboss.org
Tue Dec 4 09:33:01 EST 2018
[ https://issues.jboss.org/browse/WFLY-6847?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
ehsavoie Hugonnet reassigned WFLY-6847:
---------------------------------------
Assignee: ehsavoie Hugonnet (was: Jeff Mesnil)
> Lost large messages if backup is shutdown during synchronization
> ----------------------------------------------------------------
>
> Key: WFLY-6847
> URL: https://issues.jboss.org/browse/WFLY-6847
> Project: WildFly
> Issue Type: Bug
> Components: JMS
> Reporter: Bartosz Baranowski
> Assignee: ehsavoie Hugonnet
> Priority: Major
> Labels: downstream_dependency
>
--
This message was sent by Atlassian Jira
(v7.12.1#712002)
More information about the jboss-jira
mailing list