[jboss-jira] [JBoss JIRA] (WFLY-10702) Cover possible error when host controllers can not connect to domain after creating a rollout plan and restarting the master host controller

Jiri Ondrusek (JIRA) issues at jboss.org
Tue Jul 17 06:46:00 EDT 2018


     [ https://issues.jboss.org/browse/WFLY-10702?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Jiri Ondrusek updated WFLY-10702:
---------------------------------
    Description: 
On downstream (6.4.x) there is an error https://bugzilla.redhat.com/show_bug.cgi?id=1599625 about error during restart of master host with rollout plan. This problem doesn't happen on master, but both fix and test should to be created also for wildfly (to satisfy upstream and prevent similar problems to happen - by introducing a test).

Original problem:
Creating a rollout plan and restarting the dc host prevent the other hosts to connect to the master again. The slave hc is unable to connect giving the error JBAS014687: Resource is immutable, the dc shows many errors like:

JBAS012119:  cancelled task by interrupting thread Thread[Host Controller Service Threads - 117,5,Host Controller Service Threads]





  was:BZ-1599625 for 6.4.21 has to be fixed with test, both fix and test has to be created also for 7.1.x  and wildfly (to satisfy upstream and prevent similar problems to happen - by introducing a test), although problem doesn't happen there.



> Cover possible error when host controllers can not connect to domain after creating a rollout plan and restarting the master host controller
> --------------------------------------------------------------------------------------------------------------------------------------------
>
>                 Key: WFLY-10702
>                 URL: https://issues.jboss.org/browse/WFLY-10702
>             Project: WildFly
>          Issue Type: Bug
>            Reporter: Jiri Ondrusek
>            Assignee: Jiri Ondrusek
>
> On downstream (6.4.x) there is an error https://bugzilla.redhat.com/show_bug.cgi?id=1599625 about error during restart of master host with rollout plan. This problem doesn't happen on master, but both fix and test should to be created also for wildfly (to satisfy upstream and prevent similar problems to happen - by introducing a test).
> Original problem:
> Creating a rollout plan and restarting the dc host prevent the other hosts to connect to the master again. The slave hc is unable to connect giving the error JBAS014687: Resource is immutable, the dc shows many errors like:
> JBAS012119:  cancelled task by interrupting thread Thread[Host Controller Service Threads - 117,5,Host Controller Service Threads]



--
This message was sent by Atlassian JIRA
(v7.5.0#75005)


More information about the jboss-jira mailing list