[jboss-jira] [JBoss JIRA] (WFCORE-3987) The ReloadWithRolloutPlanTestCase test should wait for the host controller and servers to reload
James Perkins (JIRA)
issues at jboss.org
Tue Jul 31 14:17:00 EDT 2018
James Perkins created WFCORE-3987:
-------------------------------------
Summary: The ReloadWithRolloutPlanTestCase test should wait for the host controller and servers to reload
Key: WFCORE-3987
URL: https://issues.jboss.org/browse/WFCORE-3987
Project: WildFly Core
Issue Type: Bug
Components: Test Suite
Reporter: James Perkins
Assignee: James Perkins
The {{ReloadWithRolloutPlanTestCase}} test executes a {{reload}} operation, but doesn't wait for the reload to complete. This can cause intermittent errors in subsequent tests which assume the host controller or servers are started.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
More information about the jboss-jira
mailing list