[jboss-jira] [JBoss JIRA] (DROOLS-2417) Some concurrency tests are missing timeouts
Tibor Zimányi (JIRA)
issues at jboss.org
Fri Mar 23 10:37:01 EDT 2018
Tibor Zimányi created DROOLS-2417:
-------------------------------------
Summary: Some concurrency tests are missing timeouts
Key: DROOLS-2417
URL: https://issues.jboss.org/browse/DROOLS-2417
Project: Drools
Issue Type: Bug
Components: core engine
Affects Versions: 7.6.0.Final
Reporter: Tibor Zimányi
Assignee: Tibor Zimányi
Some of the tests from package org.drools.compiler.integrationtests.concurrency [1] miss timetout in the @Test annotation. This can cause build hangs when something wrong happens during a test.
[1] https://github.com/baldimir/drools/tree/6b24ae59ae21bc0146d11bcb7606d1b42a99513c/drools-compiler/src/test/java/org/drools/compiler/integrationtests/concurrency
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
More information about the jboss-jira
mailing list