[jboss-jira] [JBoss JIRA] (WFCORE-3778) The EmbeddedManagedProcess should have a start method which accepts a timeout for the server to start

James Perkins (JIRA) issues at jboss.org
Tue May 1 10:51:00 EDT 2018


     [ https://issues.jboss.org/browse/WFCORE-3778?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

James Perkins updated WFCORE-3778:
----------------------------------
    Issue Type: Feature Request  (was: Enhancement)


> The EmbeddedManagedProcess should have a start method which accepts a timeout for the server to start
> -----------------------------------------------------------------------------------------------------
>
>                 Key: WFCORE-3778
>                 URL: https://issues.jboss.org/browse/WFCORE-3778
>             Project: WildFly Core
>          Issue Type: Feature Request
>          Components: Embedded
>            Reporter: James Perkins
>            Assignee: James Perkins
>
> Currently the {{EmbeddedManagedProcess}}, which both the {{StandaloneServer}} and {{HostController}} extend, only contains a {{start()}} method which immediately returns. There should be a {{start(int timeout)}} which will wait the specified amount of time then throw an exception is the server was not successfully started within that time. A timeout of 0 or less would mean no timeout was specified and the {{start()}} method should just return immediately.
> This could also be a setting on the new {{Configuration}} API so the default {{start()}} method would have a timeout associated with it. A value of 0 should be the default so there are no behavioral changes.



--
This message was sent by Atlassian JIRA
(v7.5.0#75005)


More information about the jboss-jira mailing list