[jboss-jira] [JBoss JIRA] (WFLY-10228) Upgrade Picketlink from 2.5.5.SP10 to 2.5.5.SP11

Lin Gao (JIRA) issues at jboss.org
Mon May 14 11:24:00 EDT 2018


     [ https://issues.jboss.org/browse/WFLY-10228?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Lin Gao updated WFLY-10228:
---------------------------
    Summary: Upgrade Picketlink from 2.5.5.SP10 to 2.5.5.SP11  (was: Upgrade Picketlink Bindings from 2.5.5.SP10 to 2.5.5.SP11)


> Upgrade Picketlink from 2.5.5.SP10 to 2.5.5.SP11
> ------------------------------------------------
>
>                 Key: WFLY-10228
>                 URL: https://issues.jboss.org/browse/WFLY-10228
>             Project: WildFly
>          Issue Type: Component Upgrade
>          Components: Build System
>            Reporter: Lin Gao
>            Assignee: Vladimir Dosoudil
>              Labels: downstream_dependency
>
> https://github.com/jbossas/redhat-picketlink-bindings/compare/v2.5.5.SP10...eap-7.x
> and
> https://github.com/jbossas/redhat-picketlink/compare/v2.5.5.SP10...eap-7.x



--
This message was sent by Atlassian JIRA
(v7.5.0#75005)


More information about the jboss-jira mailing list