[jboss-jira] [JBoss JIRA] (SWSQE-520) Prepare PR jobs to be able to be run concurrenlty
Filip Brychta (Jira)
issues at jboss.org
Mon Nov 19 09:18:00 EST 2018
Filip Brychta created SWSQE-520:
-----------------------------------
Summary: Prepare PR jobs to be able to be run concurrenlty
Key: SWSQE-520
URL: https://issues.jboss.org/browse/SWSQE-520
Project: Kiali QE
Issue Type: Sub-task
Reporter: Filip Brychta
Assignee: Filip Brychta
PR jobs are running Istio-and-Kiali-on-Openshift which is configured to be run concurrently in automation pool. We need to update PR jobs config to be able to start concurrent builds.
First it's necessary to move Kiali-Istio-Checker which is checking if it's necessary to reinstall istio with bookinfo from PR jobst to Istio-and-Kiali-on-Openshift job because PR jobs don't know which cluster from pool was chosen.
--
This message was sent by Atlassian Jira
(v7.12.1#712002)
More information about the jboss-jira
mailing list