[jboss-jira] [JBoss JIRA] (SWSQE-520) Prepare PR jobs to be able to be run concurrenlty

Filip Brychta (Jira) issues at jboss.org
Mon Nov 19 11:37:00 EST 2018


     [ https://issues.jboss.org/browse/SWSQE-520?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Filip Brychta resolved SWSQE-520.
---------------------------------
    Resolution: Done


Istio-and-Kiali-on-Openshift now contains RUN_SKIP_CHECKER parameter which when true, it will check if istio, bookinfo and traffic generator is healthy. When it's healthy, it will skip installation to save time.

> Prepare PR jobs to be able to be run concurrenlty
> -------------------------------------------------
>
>                 Key: SWSQE-520
>                 URL: https://issues.jboss.org/browse/SWSQE-520
>             Project: Kiali QE
>          Issue Type: Sub-task
>            Reporter: Filip Brychta
>            Assignee: Filip Brychta
>            Priority: Minor
>
> PR jobs are running Istio-and-Kiali-on-Openshift which is configured to be run concurrently in automation pool. We need to update PR jobs config to be able to start concurrent builds.
> First it's necessary to move Kiali-Istio-Checker which is checking if it's necessary to reinstall istio with bookinfo from PR jobst to Istio-and-Kiali-on-Openshift job because PR jobs don't know which cluster from pool was chosen.



--
This message was sent by Atlassian Jira
(v7.12.1#712002)


More information about the jboss-jira mailing list