[jboss-jira] [JBoss JIRA] (DROOLS-2352) Executable model test coverage: run the optaplanner turtleTests with the executable model turned on and see if it survives the ordeal
Tibor Zimányi (JIRA)
issues at jboss.org
Mon Sep 3 07:17:00 EDT 2018
[ https://issues.jboss.org/browse/DROOLS-2352?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13627745#comment-13627745 ]
Tibor Zimányi commented on DROOLS-2352:
---------------------------------------
Tests retriggered.
> Executable model test coverage: run the optaplanner turtleTests with the executable model turned on and see if it survives the ordeal
> -------------------------------------------------------------------------------------------------------------------------------------
>
> Key: DROOLS-2352
> URL: https://issues.jboss.org/browse/DROOLS-2352
> Project: Drools
> Issue Type: Task
> Components: core engine
> Reporter: Geoffrey De Smet
> Assignee: Tibor Zimányi
>
> For now, we're looking for a one time test. Later I presume the exe model will be come the default, so these tests would just run?
> To run the optaplanner turtle tests, run all tests in optaplanner-examples with the VM parameter `-DrunTurtleTests=true`. They take 48 hours to run. You can also just run one, for example NurseRosteringSolveAllTurtleTest, but don't forget that VM parameter.
> Mario Fusco says you can do this to turn on the executable model:
> {code}
> kieBuilder.buildAll( ExecutableModelProject.class );
> {code}
> I presume you 'd need to hack that in `ScoreDirectorFactoryConfig.buildDroolsScoreDirectorFactory()`.
> Note: I have no idea if this even make sense: those turtle tests use a drl file input and don't use the kie-maven-plugin. We're looking for a switch to just turn it on and see if they are all still green. Mario thinks it's possible, if I understand it correctly.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
More information about the jboss-jira
mailing list