[jboss-jira] [JBoss JIRA] (SWSQE-416) Pipeline Problems on PR Tester

Guilherme Baufaker Rêgo (JIRA) issues at jboss.org
Fri Sep 14 17:22:00 EDT 2018


     [ https://issues.jboss.org/browse/SWSQE-416?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Guilherme Baufaker Rêgo updated SWSQE-416:
------------------------------------------
    Description: 
h3. Problem 1

The E2E test was not running Bookinfo and Istio on the Test environment, so it is possible to have a situation when tests fail not because of a problem on Test itself but an environment problem

  was:
h1. Problem 1

The E2E test was not running Bookinfo and Istio on the Test environment, so it is possible to have a situation when tests fail not because of a problem on Test itself but an environment problem



> Pipeline Problems on PR Tester
> ------------------------------
>
>                 Key: SWSQE-416
>                 URL: https://issues.jboss.org/browse/SWSQE-416
>             Project: Kiali QE
>          Issue Type: Bug
>            Reporter: Guilherme Baufaker Rêgo
>            Assignee: Guilherme Baufaker Rêgo
>
> h3. Problem 1
> The E2E test was not running Bookinfo and Istio on the Test environment, so it is possible to have a situation when tests fail not because of a problem on Test itself but an environment problem



--
This message was sent by Atlassian JIRA
(v7.5.0#75005)



More information about the jboss-jira mailing list