[jboss-jira] [JBoss JIRA] (SWSQE-416) Pipeline Problems on PR Tester
Guilherme Baufaker Rêgo (JIRA)
issues at jboss.org
Fri Sep 14 17:23:00 EDT 2018
[ https://issues.jboss.org/browse/SWSQE-416?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Guilherme Baufaker Rêgo updated SWSQE-416:
------------------------------------------
Description:
{panel:title=Problem 1}
*The E2E test was not running Bookinfo and Istio on the Test environment, so it is possible to have a situation when tests fail not because of a problem on Test itself but an environment problem*
{panel}
h3. Problem 1
was:
h3. Problem 1
The E2E test was not running Bookinfo and Istio on the Test environment, so it is possible to have a situation when tests fail not because of a problem on Test itself but an environment problem
> Pipeline Problems on PR Tester
> ------------------------------
>
> Key: SWSQE-416
> URL: https://issues.jboss.org/browse/SWSQE-416
> Project: Kiali QE
> Issue Type: Bug
> Reporter: Guilherme Baufaker Rêgo
> Assignee: Guilherme Baufaker Rêgo
>
> {panel:title=Problem 1}
> *The E2E test was not running Bookinfo and Istio on the Test environment, so it is possible to have a situation when tests fail not because of a problem on Test itself but an environment problem*
> {panel}
> h3. Problem 1
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
More information about the jboss-jira
mailing list