[jboss-jira] [JBoss JIRA] (SWSQE-580) Get started with Upshift/PSI
Filip Brychta (Jira)
issues at jboss.org
Mon Feb 4 04:13:01 EST 2019
[ https://issues.jboss.org/browse/SWSQE-580?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Filip Brychta updated SWSQE-580:
--------------------------------
Description:
UpShift is PnT’s shared lab cloud capable of running a wide range of workloads for PnT including RHV, Openstack, Openshift
Deployed & maintained by PnT DevOps SysOps
https://docs.engineering.redhat.com/display/HSSP/PNT+Shared+Infrastructure+%28PSI%29+Production+RDU+-+Cloud+Living+Doc
> Get started with Upshift/PSI
> ----------------------------
>
> Key: SWSQE-580
> URL: https://issues.jboss.org/browse/SWSQE-580
> Project: Kiali QE
> Issue Type: Story
> Reporter: Matt Mahoney
> Assignee: Filip Brychta
> Priority: Major
>
> UpShift is PnT’s shared lab cloud capable of running a wide range of workloads for PnT including RHV, Openstack, Openshift
> Deployed & maintained by PnT DevOps SysOps
> https://docs.engineering.redhat.com/display/HSSP/PNT+Shared+Infrastructure+%28PSI%29+Production+RDU+-+Cloud+Living+Doc
--
This message was sent by Atlassian Jira
(v7.12.1#712002)
More information about the jboss-jira
mailing list