[jboss-jira] [JBoss JIRA] (JGRP-2361) Error related to Jgroup and Database connection is getting reset

Bela Ban (Jira) issues at jboss.org
Wed Jul 31 07:08:04 EDT 2019


    [ https://issues.jboss.org/browse/JGRP-2361?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13765158#comment-13765158 ] 

Bela Ban commented on JGRP-2361:
--------------------------------

Could be that you're running different versions of JGroups (cookie sent by /172.26.235.231:43565 does not match own cookie; terminating connection). What's your JGroups config?

> Error related to Jgroup and Database connection is getting reset
> ----------------------------------------------------------------
>
>                 Key: JGRP-2361
>                 URL: https://issues.jboss.org/browse/JGRP-2361
>             Project: JGroups
>          Issue Type: Bug
>    Affects Versions: 3.6.11
>         Environment: Hybris running on tomcat - Centos 7
>            Reporter: karthikeyan Aruljothi
>            Assignee: Bela Ban
>            Priority: Major
>         Attachments: Jgroup error in preprod-000.txt, Jgroups blocking and terminating connection.txt, Jgroups error in console.txt, error Jgroups.txt
>
>
> Hi ,
> we are facing an issue with our cluster configuration and due to this  JVM responding time also takes more time, after clearing the cache / restarting all nodes  application works as expected.
> When issue arises one of the core occupies 100% cpu utilization then it confirms to restart the server otherwise it never process any request. Below is our configuration in local.properties. Also providing error logs as attachment. could see error in logs related to Jgroups blocking and connection getting terminated between nodes.
> Let us know your valuable inputs, on what exactly the issue i.e causing the slowness then blocking the whole server.
> Attached cluster configuration for each nodes  and error logs
> Adding to this we are getting  below error while doing deployment/restarting of servers 
> WARN  [localhost-startStop-1] [GMS] hybrisnode-0: JOIN(hybrisnode-0) sent to hybrisnode-2 timed out (after 3000 ms), on try 3
> WARN  [pool-3-thread-1] [GMS] hybrisnode-3: JOIN(hybrisnode-3) sent to hybrisnode-1 timed out (after 3000 ms), on try 4



--
This message was sent by Atlassian Jira
(v7.12.1#712002)


More information about the jboss-jira mailing list