[jboss-jira] [JBoss JIRA] (SWSQE-612) QE CI/CP Integration - stage 2
Guilherme Baufaker Rêgo (Jira)
issues at jboss.org
Thu Mar 14 18:35:00 EDT 2019
[ https://issues.jboss.org/browse/SWSQE-612?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Guilherme Baufaker Rêgo updated SWSQE-612:
------------------------------------------
Labels: infrastructure (was: )
> QE CI/CP Integration - stage 2
> ------------------------------
>
> Key: SWSQE-612
> URL: https://issues.jboss.org/browse/SWSQE-612
> Project: Kiali QE
> Issue Type: Story
> Reporter: Filip Brychta
> Assignee: Michael Foley
> Priority: Minor
> Labels: infrastructure
>
> This story is to track future tasks when the stage 1 is finished.
> Tasks from this story might be worked simultaneously with stage 1 tasks but with lower priority.
--
This message was sent by Atlassian Jira
(v7.12.1#712002)
More information about the jboss-jira
mailing list