[jboss-jira] [JBoss JIRA] (WFLY-13767) Upgrade PicketLink bindings from 2.5.5.SP12-redhat-00012 to 2.5.5.SP12-redhat-00013

Ilia Vassilev (Jira) issues at jboss.org
Wed Aug 12 08:46:00 EDT 2020


     [ https://issues.redhat.com/browse/WFLY-13767?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Ilia Vassilev moved JBEAP-20072 to WFLY-13767:
----------------------------------------------

          Project: WildFly  (was: JBoss Enterprise Application Platform)
              Key: WFLY-13767  (was: JBEAP-20072)
         Workflow: GIT Pull Request workflow   (was: CDW with loose statuses v1)
      Component/s: Build System
                       (was: Build System)
    Fix Version/s:     (was: 7.3.3.GA)


> Upgrade PicketLink bindings from 2.5.5.SP12-redhat-00012 to 2.5.5.SP12-redhat-00013
> -----------------------------------------------------------------------------------
>
>                 Key: WFLY-13767
>                 URL: https://issues.redhat.com/browse/WFLY-13767
>             Project: WildFly
>          Issue Type: Component Upgrade
>          Components: Build System
>            Reporter: Ilia Vassilev
>            Assignee: Ilia Vassilev
>            Priority: Major
>
> Branch: https://github.com/jbossas/redhat-picketlink-bindings/tree/2.5.5.SP
> Diff: https://github.com/jbossas/redhat-picketlink-bindings/compare/v2.5.5.SP12-45-g28d4fac...v2.5.5.SP12-47-g7506ec4
> https://github.com/jbossas/redhat-picketlink-bindings/tree/v2.5.5.SP12-47-g7506ec4
> Commit hash: 7506ec41fc6372ec1039b0212078cec4bd389165



--
This message was sent by Atlassian Jira
(v7.13.8#713008)


More information about the jboss-jira mailing list