[jboss-svn-commits] JBL Code SVN: r20093 - labs/jbossesb/workspace/CDL/product/samples/trailblazer.

jboss-svn-commits at lists.jboss.org jboss-svn-commits at lists.jboss.org
Wed May 21 02:08:13 EDT 2008


Author: jeff.yuchang
Date: 2008-05-21 02:08:13 -0400 (Wed, 21 May 2008)
New Revision: 20093

Modified:
   labs/jbossesb/workspace/CDL/product/samples/trailblazer/readme.txt
Log:
Remove the "with monitoring" instructions, as it has been moved the overlord project.


Modified: labs/jbossesb/workspace/CDL/product/samples/trailblazer/readme.txt
===================================================================
--- labs/jbossesb/workspace/CDL/product/samples/trailblazer/readme.txt	2008-05-21 06:05:49 UTC (rev 20092)
+++ labs/jbossesb/workspace/CDL/product/samples/trailblazer/readme.txt	2008-05-21 06:08:13 UTC (rev 20093)
@@ -42,25 +42,3 @@
 because the score is less than 4, or two emails (one from JMS bank and one from FileBased
 bank) with valid quotes.
 
-
-With monitoring functionality running instructions:
-------------------------------------------------------
-To run the Trailblazer example with monitoring functionality.
-
-1 - download the pi4soa tool suite from http://pi4soa.wiki.sourceforge.net/download.
-
-2 - create a new Java project and import into Eclipse environment configured with pi4soa tools using the Import->Archive from the Project context menu.
-    The TrailBlazerModels.zip should be located in the TB_ROOT/models folder.
-
-3 - In the Eclipse project, from the context menu for the models/TrailBlazer.cdm file.
-    select Choreography->Monitor. When it indicates “Monitoring TrailBlazer” on the status line.
-
-4 - please make sure you have done everything needed that shown in the "Required to run the Trailblazer" and the "Settings required to edit before running" section.
-
-5 - from the TB_ROOT, execute the command to deploy monitor related packages: "ant deploy-monitor-lib".
-
-6 - following in instructions in the "Basic Trailblazer example running instructions" section.
-
-7 - Repeat the loan request step multiple times, remembering to change the SSN number to create new transactions in the monitor.
-
-8 - once you finish your testing, you can run command "ant undeploy-monitor-lib" to remove the monitor library and filter.




More information about the jboss-svn-commits mailing list