Hi,
We have a requirement where in async processing has to be done in parallel for two of the tasks and the combined result should be sent to the requestor in a third asnych processing.
Is this possible with JBossMQ?
Process 1 > MDB1 processing
Process 2 > MDB2 processing
Process 3 > MDB3 processing (when both the MDB1 and MDB2 processing is completed)
Need some help/insight if this can be achieved in JbossMQ.
Please forward the links/documentation to achieve the same if possible.
Thanks,