"manik.surtani at jboss.com" wrote : Well all you're doing by increasing FC creds is pushing the threshold higher before you see a problem.  This usually works since most network hiccups or temporary slowdowns correct themselves after some time and the cluster returns to full speed .  
  | 
  | Either you still don't have enough credits, or, if you consistently and regularly see this problem, then maybe the issue is elsewhere.  Do you see any other issues with the cache system that may shed some light? 
Thanks for the response. 
I have not noticed anything else in the cache system - but maybe that is because i am not sure where and what to look for.  Given that there has been no failure for almost 6 days now, I am assuming it was some kind of temporary slowdown.  What would be the upper limit or downside of increasing the max credits value since in my current scenario there is no way of measuring how the credits are being used?

Thanks

Ramdas

View the original post : http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4077592#4077592

Reply to the post : http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=4077592



More information about the jboss-user mailing list