[jbosstools-dev] Beta2 update - almost there! (was Re: Approaching Code Freeze for Beta2 :: FINAL ORDERS, PLEASE!)

Max Andersen manderse at redhat.com
Fri Mar 23 17:32:10 EDT 2012


Sorry - I'm on my way to bed to catch train very early. I'll try when I get to a network. 

Sent from a mobile device

On 23/03/2012, at 22.29, Len DiMaggio <ldimaggi at redhat.com> wrote:

> I can't get Central to open - funny - there is no ERROR written to the log until I close eclipse. Max - is this working for you?
> 
> 
> --Len
> 
> 
> 
> 
> From: "Max Andersen" <manderse at redhat.com>
> To: "Nick Boldt" <nboldt at redhat.com>
> Cc: "jbds-pm-list" <jbds-pm-list at redhat.com>, jbosstools-dev at lists.jboss.org, external-exadel-list at redhat.com
> Sent: Friday, March 23, 2012 5:27:06 PM
> Subject: Re: [jbosstools-dev] Beta2 update - almost there! (was Re:        Approaching Code Freeze for Beta2 :: FINAL ORDERS, PLEASE!)
> 
> I've just got info that the forge runtime fixes contains a bug. Everything else can be verified on this beta2 build. I hope to get more info soon to hear how severe the bug is. 
> 
> Sent from a mobile device
> 
> On 23/03/2012, at 19.23, Nick Boldt <nboldt at redhat.com> wrote:
> 
> > JBT 3.3.0.Beta2 is out (see other email w/ links).
> > 
> > JBDS 5.0.0.Beta2 is pending. We're #7 in the Jenkins queue for the last 
> > build job in our stack, which produces the JBDS top-level product 
> > feature (the one that allows the JBDS product to be updated).
> > 
> > http://hudson.qa.jboss.com/hudson/job/devstudio-5.0_stable_branch.product/ 
> >> =115
> > 
> > As you of course know, this means the Beta1 branch is now CLOSED for any 
> > new commits. Please don't push anything in there w/o attaching a patch 
> > to a JIRA AND getting PM approval.
> > 
> > Have a good weekend,
> > 
> > Nick
> > 
> > On 03/22/2012 01:06 PM, Nick Boldt wrote:
> >> Note that predictably, I announce "we might be able to do it sooner" and
> >> an hour later I've taken two slaves offline due to OOM and "no locks
> >> available" problems.
> >> 
> >> https://engineering.redhat.com/rt/Ticket/Display.html?id=147071
> >> https://engineering.redhat.com/rt/Ticket/Display.html?id=147072
> >> 
> >> On the plus side, Openshift is already done, so now we just need Maven,
> >> Forge, and VPE.
> >> 
> >> On 03/22/2012 11:54 AM, Max Rydahl Andersen wrote:
> >>> 
> >>> VPE and Forge will be fixed.
> >>> 
> >>> WS/JAX-RS and Hibernate is being looked at but I do not think they
> >>> will be relevant for beta2 at this time.
> >>> 
> >>> /max
> >>> 
> >>> On Mar 22, 2012, at 4:50 PM, Nick Boldt wrote:
> >>> 
> >>>> I see 6 open issues assigned to a Beta2 target.
> >>>> 
> >>>> Are all these going to be fixed& committed today or tomorrow? If not,
> >>>> can the owners move them off to Beta3 target? Components include WS,
> >>>> Hibernate, VPE& Forge.
> >>>> 
> >>>> https://issues.jboss.org/secure/IssueNavigator!executeAdvanced.jspa?jqlQuery=project+in+%28JBIDE%2C+JBDS%2C+TOOLSDOC%29+AND+fixVersion+in+%28%275.0.0.Beta2%27%2C+%273.3.0.Beta2%27%29+and+Status+not+in+%28Resolved%2CClosed%29&runQuery=true&clear=true
> >>>> 
> >>>> 
> >>>> 
> >>>> - or -
> >>>> 
> >>>> https://issues.jboss.org/secure/IssueNavigator.jspa?mode=show&createNew=true
> >>>> 
> >>>> --> then paste in this:
> >>>> 
> >>>> project in (JBIDE, JBDS, TOOLSDOC) AND fixVersion in ('5.0.0.Beta2',
> >>>> '3.3.0.Beta2') and Status not in (Resolved,Closed)
> >>>> 
> >>>> 
> >>>> On 03/22/2012 11:36 AM, Nick Boldt wrote:
> >>>>> Based on recent commits in SVN, I see two builds left to run for Beta2:
> >>>>> 
> >>>>> * OpenShift, SVN r39770, build #66 in progress (waiting for a slave)
> >>>>> * Maven, SVN r39676, build #81 in progress (waiting for a slave)
> >>>>> 
> >>>>> Other respins are done, including: AS, Examples, VPE, Hibernate,
> >>>>> Central, and Runtime.
> >>>>> 
> >>>>> After that, we need to run the 3 aggregate jobs for JBT and JBDS.
> >>>>> 
> >>>>> --
> >>>>> 
> >>>>> Does anyone else have anything pending for commit to the Beta1 branch
> >>>>> for inclusion in the Beta2 bits? If not, I may be able to get the build
> >>>>> out to QE sooner than previously planned.
> >>>>> 
> >>>> 
> >>>> --
> >>>> Nick Boldt :: JBoss by Red Hat
> >>>> Productization Lead :: JBoss Tools& Dev Studio
> >>>> http://nick.divbyzero.com
> >>>> _______________________________________________
> >>>> jbosstools-dev mailing list
> >>>> jbosstools-dev at lists.jboss.org
> >>>> https://lists.jboss.org/mailman/listinfo/jbosstools-dev
> >>>> 
> >>>> 
> >>> 
> >> 
> > 
> > -- 
> > Nick Boldt :: JBoss by Red Hat
> > Productization Lead :: JBoss Tools & Dev Studio
> > http://nick.divbyzero.com
> > _______________________________________________
> > jbosstools-dev mailing list
> > jbosstools-dev at lists.jboss.org
> > https://lists.jboss.org/mailman/listinfo/jbosstools-dev
> 
> 
> 
> 
> -- 
> 
> Len DiMaggio (ldimaggi at redhat.com)
> JBoss by Red Hat
> 314 Littleton Road
> Westford, MA 01886  USA
> tel:  978.392.3179
> cell: 781.472.9912
> http://www.redhat.com
> http://community.jboss.org/people/ldimaggio
> 
> <RHxJBpngthumb.png>
> 
> <beta2.log>
> _______________________________________________
> jbosstools-dev mailing list
> jbosstools-dev at lists.jboss.org
> https://lists.jboss.org/mailman/listinfo/jbosstools-dev
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.jboss.org/pipermail/jbosstools-dev/attachments/20120323/f4bfc099/attachment.html 


More information about the jbosstools-dev mailing list