[jbosstools-dev] Red Builds, Yellow Builds & Test Failures (getting ready for Code Freeze TOMORROW)

André Dietisheim adietish at redhat.com
Fri Apr 5 17:07:18 EDT 2013


On 04/05/2013 10:08 PM, Snjezana Peco wrote:
> A test doesn't have to be an UI test to open the 
> UsageReportEnablementDialog dialog.
> The dialog is created using the startup extension point. That's why 
> the usage plugin will always try to open this dialog.
>

hmm, I looked at the patch and the test. To me the integration test is 
using fakes and I therefore dont see where the test would trigger the 
dialog.
I tend to think that the Eclipse runtime that is running the test has 
the plugin installed and opens the dialog independently of the tests. 
Thus I thinking that the flag ( - Dusage_reporting_enabled=false) is not 
working properly? Or some similar explanation... wrong?

> The issue can't be reproduced on Windows. It can always be reproduced 
> on Linux when using Kepler M6. Not sure for Mac.
>
> The issue isn't caused by changes in usage/JBT, but in Kepler M6.
>
> Snjeza
>
> On 4/5/2013 9:28 PM, André Dietisheim wrote:
>> On 04/05/2013 09:00 PM, Nick Boldt wrote:
>>> Isn't there a commandline flag to suppress that so that the test DOES
>>> NOT block until timeout?
>>
>> As far as I can say the flag is only suppressing the usage in 
>> SWTBot-Test where a UI is actually run. The usage test are not 
>> running UI, thus the flag has no effect on them. Furthermore I can 
>> run those (even without flag, just by 'mvn clean verify') locally and 
>> they run perfectly smooth.
>>
>> [INFO] usage.tests ....................................... SUCCESS 
>> [0.004s]
>> [INFO] org.jboss.tools.usage.test ........................ SUCCESS 
>> [10.156s]
>>
>> There was 0 change in usage since Alpha1 (and even before) so I 
>> wonder why this should now fail?
>> I have to test with Kepler TP though.
>>
>>
>> On 04/05/2013 02:56 PM, Snjezana Peco wrote:
>>>> Yes, they do.
>>>>
>>>> Snjeza
>>>>
>>>> On 4/5/2013 8:41 PM, Nick Boldt wrote:
>>>>> Do the usage tests involve waiting for a user to click the dialog
>>>>> asking if it's OK to collect anonymous usage stats?
>>>>>
>>>>> N
>>>>>
>>>>> On 04/05/2013 02:19 PM, Snjezana Peco wrote:
>>>>>> See https://issues.jboss.org/browse/JBIDE-13939 and
>>>>>> https://jenkins.mw.lab.eng.bos.redhat.com/hudson/view/JBossTools/view/JBossTools_Trunk/job/jbosstools-base_master/220/console 
>>>>>>
>>>>>>
>>>>>>
>>>>>>
>>>>>> The usage tests take 1.02 sec, but freeze.
>>>>>>
>>>>>> Snjeza
>>>>>>
>>>>>> On 4/3/2013 9:33 PM, Snjezana Peco wrote:
>>>>>>> I have created JBIDE-13908, JBIDE-13910, JBIDE-13911 and reopened
>>>>>>> JBIDE-13733. They are related to tests.
>>>>>>>
>>>>>>> Snjeza
>>>>>>>
>>>>>>> On 4/3/2013 6:30 PM, Nick Boldt wrote:
>>>>>>>> As code freeze is tomorrow, it's that time of the month where I
>>>>>>>> have the
>>>>>>>> pleasure of sending reminder note that if your job is red or 
>>>>>>>> yellow,
>>>>>>>> *you need to fix your tests*.
>>>>>>>>
>>>>>>>> Here are today's failures. You'll note that they've all been
>>>>>>>> failing for
>>>>>>>> about a week.
>>>>>>>>
>>>>>>>> == RED ==
>>>>>>>>
>>>>>>>> Base: Failing tests since Mar 24
>>>>>>>>
>>>>>>>> Forge: 2 test failures, 8 skipped tests since Mar 24
>>>>>>>>
>>>>>>>> Hibernate: COMPILATION FAILURES since ??? (last good build on 
>>>>>>>> Feb 18)
>>>>>>>>
>>>>>>>> JavaEE: 7 test failures since Mar 31; 11 test failures since 
>>>>>>>> Mar 21
>>>>>>>>
>>>>>>>> == YELLOW ==
>>>>>>>>
>>>>>>>> Central: 1-2 test failures since Apr 1
>>>>>>>>
>>>>>>>> JST: 20+ test failures since Mar 28
>>>>>>>>
>>>>>>>> Web Services: 917 test failures since Mar 24
>>>>>>>>
>>
>

-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.jboss.org/pipermail/jbosstools-dev/attachments/20130405/7d220449/attachment.html 


More information about the jbosstools-dev mailing list