[jbosstools-dev] QE Approval for Devstudio 11.1.0.GA and JBT 4.5.1.Final release - master branch is unfrozen

Nick Boldt nboldt at redhat.com
Wed Nov 1 13:45:12 EDT 2017


Note that the jobs are still disabled to allow me to have enough slaves to
push the release out, and to ensure no pollution of 4.5.2 or 11.2 in the
current builds. This is also so that I have time to update parent pom and
root poms.

When they're ready, I'll re-enable the CI jobs.

On Tue, Oct 31, 2017 at 12:57 PM, Pavol Srna <psrna at redhat.com> wrote:

> Hi,
>
> Devstudio QE and Fuse Tooling QE is done with testing and approve
> Devstudio 11.1.0.GA / JBT 4.5.1.Final release. The master branch is no
> longer frozen.
>
> Please begin staging the bits.
>
> Unresolved critical issues have been discussed with PM and do not block
> the release. You can find the list in the sign-off document.
>
> The sign-off doc is here: https://mojo.redhat.com/docs/DOC-1154031
>
> Thank you.
>
>


-- 

Nick Boldt

Senior Software Engineer, RHCSA

Productization Lead :: JBoss Tools & Dev Studio

IM: @nickboldt / @nboldt / http://nick.divbyzero.com
<https://red.ht/sig>
TRIED. TESTED. TRUSTED. <https://redhat.com/trusted>
@ @redhatnews <https://twitter.com/redhatnews>      Red Hat
<https://www.facebook.com/RedHatInc>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.jboss.org/pipermail/jbosstools-dev/attachments/20171101/284c1fe1/attachment-0001.html 


More information about the jbosstools-dev mailing list