[jbosstools-issues] [JBoss JIRA] Created: (RHDS-334) In GPD - right-click on a task node does not display options to add actions or tasks

Len DiMaggio (JIRA) jira-events at lists.jboss.org
Thu Nov 29 10:55:01 EST 2007


In GPD - right-click on a task node does not display options to add actions or tasks
------------------------------------------------------------------------------------

                 Key: RHDS-334
                 URL: http://jira.jboss.com/jira/browse/RHDS-334
             Project: Red Hat Developer Studio
          Issue Type: Bug
          Components: visualeditor
    Affects Versions: 1.0.0.CR1
         Environment: Red Hat Developer Studio - Build id: 1.0.0.CR1
Designer plugin 3.1.0.sp1
jbpm-jpdl-suite-3.2.2 (for jBPM runtime)
            Reporter: Len DiMaggio
         Attachments: Screenshot_eclipse.png, Screenshot_RHDS.png

Description of problem:
In the GPD, right-clicking on a task does not display options to add actions or tasks in RHDS CR1. 

Contrast - this does work correctly with:
   Core and Designer plugin 3.0.13
   jbpm-jpdl-suite-3.2.2 (for runtime) 
   Eclipse Europa - Version: 3.3.1.1 

Version-Release number of selected component (IR or RC #, component ver)
Red Hat Developer Studio - Build id: 1.0.0.CR1

How reproducible:
100%

Steps to Reproduce: 
1. Access the websale example program - shipped with jbpm-jpdl-suite-3.2.2 
2. Edit the processdefinition.xml file with the GPD
3. Right-click on a task node

Actual results:
See RHDS screenshot - attached

Expected results:
See Eclipse screenshot - attached

Additional info: (e.g., stack trace)

Attachments (e.g., server log)

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.jboss.com/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        



More information about the jbosstools-issues mailing list