[jbosstools-issues] [JBoss JIRA] Resolved: (JBIDE-3301) Finish button on Rule Wizard enabled before complete
Kris Verlaenen (JIRA)
jira-events at lists.jboss.org
Fri Dec 5 19:23:36 EST 2008
[ https://jira.jboss.org/jira/browse/JBIDE-3301?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Kris Verlaenen resolved JBIDE-3301.
-----------------------------------
Resolution: Done
Finish button only enabled when all required information available
> Finish button on Rule Wizard enabled before complete
> ----------------------------------------------------
>
> Key: JBIDE-3301
> URL: https://jira.jboss.org/jira/browse/JBIDE-3301
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: drools
> Affects Versions: 3.0.0.cr1
> Environment: JBossTools-3.0.0.CR1-N200811261221-ALL-linux-gtk.zip
> Reporter: John Graham
> Priority: Minor
> Fix For: 3.0.0.cr1
>
>
> The Finish button on the Rule Resource wizard is enabled before all the necessary information (target folder, rule file name, package name) is present. This button should be enabled/disabled depending on the presence/absence of these required fields.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: https://jira.jboss.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jbosstools-issues
mailing list