[jbosstools-issues] [JBoss JIRA] Commented: (JBDS-560) Drools runtime is not configured after JBDS is started
Snjezana Peco (JIRA)
jira-events at lists.jboss.org
Tue Mar 10 18:29:22 EDT 2009
[ https://jira.jboss.org/jira/browse/JBDS-560?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12456545#action_12456545 ]
Snjezana Peco commented on JBDS-560:
------------------------------------
I have fixed this issue in the jbosstools-3.0.x branch.
Will fix it in the trunk as soon as drools-ide CR1 is in the trunk.
> Drools runtime is not configured after JBDS is started
> ------------------------------------------------------
>
> Key: JBDS-560
> URL: https://jira.jboss.org/jira/browse/JBDS-560
> Project: Developer Studio
> Issue Type: Bug
> Components: installer
> Affects Versions: 2.0.0.cr2
> Reporter: Anton Klimkovich
> Assignee: Snjezana Peco
> Priority: Critical
> Fix For: 2.0.0.GA
>
>
> EXECUTE: On step 5 select SOA-p as additional runtime.
> FAILURE: Drools runtime isn't setuped after installation completed.
> Related with JBDS-483
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: https://jira.jboss.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jbosstools-issues
mailing list