[jbosstools-issues] [JBoss JIRA] Created: (JBIDE-6839) BPEL Validator is called twice for every BPEL resource in a project when editor is saved
Robert (Bob) Brodt (JIRA)
jira-events at lists.jboss.org
Sat Aug 14 00:49:12 EDT 2010
BPEL Validator is called twice for every BPEL resource in a project when editor is saved
----------------------------------------------------------------------------------------
Key: JBIDE-6839
URL: https://jira.jboss.org/browse/JBIDE-6839
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: bpel
Reporter: Robert (Bob) Brodt
Assignee: Robert (Bob) Brodt
Priority: Minor
Fix For: 3.2.x
Need to figure out why the model defines both a org.eclipse.core.resources.builders and a org.eclipse.wst.validation.validator extension point - both of these eventually call the model Builder.validate(). The result is that ALL BPEL files in a project get validated TWICE whenever you save a BPEL editor resource.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: https://jira.jboss.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jbosstools-issues
mailing list