[jbosstools-issues] [JBoss JIRA] Resolved: (JBIDE-6583) org.jboss.tools.seam.ui.test takes more than 15 mins - can it be split into smaller pieces?

Nick Boldt (JIRA) jira-events at lists.jboss.org
Thu Aug 26 01:24:12 EDT 2010


     [ https://jira.jboss.org/browse/JBIDE-6583?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Nick Boldt resolved JBIDE-6583.
-------------------------------

    Resolution: Done


As of http://hudson.qa.jboss.com/hudson/view/DevStudio_Tycho/job/jbosstools-3.2.0.M3/15/testReport/ this test suite is running, but includes numerous test failures:

>>><<< org.jboss.tools.seam.ui.test.SeamUiAllTests.Seam Project New Wizard Tests 
>>><<< org.jboss.tools.seam.ui.test.SeamUiAllTests.testFrameworkComponents 
>>><<< org.jboss.tools.seam.ui.test.SeamUiAllTests.testMessages 
>>><<< org.jboss.tools.seam.ui.test.SeamUiAllTests.testVarAttributes 
>>><<< org.jboss.tools.seam.ui.test.SeamUiAllTests.testInterface 
>>><<< org.jboss.tools.seam.ui.test.SeamUiAllTests.testSeamELContentAssist 
>>><<< org.jboss.tools.seam.ui.test.SeamUiAllTests.testSeamELContentAssistJbide1645 
>>><<< org.jboss.tools.seam.ui.test.SeamUiAllTests.testSettingsPage 

So, while this JIRA can be closed, I'll open a new one for these failures.

https://jira.jboss.org/browse/JBIDE-6918

> org.jboss.tools.seam.ui.test takes more than 15 mins - can it be split into smaller pieces?
> -------------------------------------------------------------------------------------------
>
>                 Key: JBIDE-6583
>                 URL: https://jira.jboss.org/browse/JBIDE-6583
>             Project: Tools (JBoss Tools)
>          Issue Type: Sub-task
>          Components: Seam
>    Affects Versions: 3.2.0.M1
>            Reporter: Nick Boldt
>            Assignee: Alexey Kazakov
>             Fix For: 3.2.0.Beta
>
>
> [ERROR] Failed to execute goal org.sonatype.tycho:maven-osgi-test-plugin:0.9.0:test (default-test) on project org.jboss.tools.seam.ui.test: Error while executing platform: Error while executing external command, process killed. Process timeout out after 900 seconds -> [Help 2]
> org.apache.maven.lifecycle.LifecycleExecutionException: Failed to execute goal org.sonatype.tycho:maven-osgi-test-plugin:0.9.0:test (default-test) on project org.jboss.tools.seam.ui.test: Error while executing platform
> 	at org.apache.maven.lifecycle.internal.MojoExecutor.execute(MojoExecutor.java:141)
> org.jboss.tools.seam.ui.test takes more than 15 mins - can it be split into smaller pieces?

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: https://jira.jboss.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        


More information about the jbosstools-issues mailing list