[jbosstools-issues] [JBoss JIRA] Assigned: (JBDS-1442) jBPM project import from JBDS 3.0.1.GA into JBDS.4.0.0.Beta2 workspace doesn't work

Brian Fitzpatrick (JIRA) jira-events at lists.jboss.org
Mon Dec 6 13:07:01 EST 2010


     [ https://jira.jboss.org/browse/JBDS-1442?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Brian Fitzpatrick reassigned JBDS-1442:
---------------------------------------

    Assignee: Koen Aers


Koen, can you take a look at this?

> jBPM project import from JBDS 3.0.1.GA into JBDS.4.0.0.Beta2 workspace doesn't work
> -----------------------------------------------------------------------------------
>
>                 Key: JBDS-1442
>                 URL: https://jira.jboss.org/browse/JBDS-1442
>             Project: Developer Studio (JBoss Developer Studio)
>          Issue Type: Bug
>          Components: jBPM
>    Affects Versions: 4.0.0.Beta2
>         Environment: JBDS 3.0.1.GA, JBDS 4.0.0Beta2 (jbdevstudio-eap-linux-gtk-4.0.0.v201012021737R-H23-Beta2), jboss-soa-p.5.0.0, linux32bit
>            Reporter: Pavol Srna
>            Assignee: Koen Aers
>
> The jBPM Runtime is corrupted after project import and it is not possible to correct it.

-- 
This message is automatically generated by JIRA.
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        


More information about the jbosstools-issues mailing list