[jbosstools-issues] [JBoss JIRA] Resolved: (JBIDE-6582) org.jboss.tools.drools.ui.bot.test takes more than 15 mins - split into smaller pieces?
Denis Golovin (JIRA)
jira-events at lists.jboss.org
Fri Dec 17 08:54:19 EST 2010
[ https://issues.jboss.org/browse/JBIDE-6582?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Denis Golovin resolved JBIDE-6582.
----------------------------------
Resolution: Done
I considered it as fixed because now it is built as eclipse-plugin. I'll figure it out how to make it as eclipse-test-plugin with disabled execution by default and enable it only for job from JBIDE-7727
> org.jboss.tools.drools.ui.bot.test takes more than 15 mins - split into smaller pieces?
> ---------------------------------------------------------------------------------------
>
> Key: JBIDE-6582
> URL: https://issues.jboss.org/browse/JBIDE-6582
> Project: Tools (JBoss Tools)
> Issue Type: Sub-task
> Components: drools
> Reporter: Nick Boldt
> Assignee: Denis Golovin
> Fix For: 3.2.0.CR1
>
> Original Estimate: 0 minutes
> Remaining Estimate: 0 minutes
>
> [ERROR] Failed to execute goal org.sonatype.tycho:maven-osgi-test-plugin:0.9.0:test (default-test) on project org.jboss.tools.drools.ui.bot.test: Error while executing platform: Error while executing external command, process killed. Process timeout out after 900 seconds -> [Help 2]
> org.apache.maven.lifecycle.LifecycleExecutionException: Failed to execute goal org.sonatype.tycho:maven-osgi-test-plugin:0.9.0:test (default-test) on project org.jboss.tools.drools.ui.bot.test: Error while executing platform
> at org.apache.maven.lifecycle.internal.MojoExecutor.execute(MojoExecutor.java:141)
> Does this test need more time? Can it be split into smaller pieces?
--
This message is automatically generated by JIRA.
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jbosstools-issues
mailing list