[jbosstools-issues] [JBoss JIRA] Created: (JBIDE-6582) org.jboss.tools.drools.ui.bot.test takes more than 15 mins - split into smaller pieces?
Nick Boldt (JIRA)
jira-events at lists.jboss.org
Mon Jul 5 23:05:46 EDT 2010
org.jboss.tools.drools.ui.bot.test takes more than 15 mins - split into smaller pieces?
---------------------------------------------------------------------------------------
Key: JBIDE-6582
URL: https://jira.jboss.org/browse/JBIDE-6582
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: drools
Reporter: Nick Boldt
Assignee: Kris Verlaenen
Fix For: 3.2.0.M1
[ERROR] Failed to execute goal org.sonatype.tycho:maven-osgi-test-plugin:0.9.0:test (default-test) on project org.jboss.tools.drools.ui.bot.test: Error while executing platform: Error while executing external command, process killed. Process timeout out after 900 seconds -> [Help 2]
org.apache.maven.lifecycle.LifecycleExecutionException: Failed to execute goal org.sonatype.tycho:maven-osgi-test-plugin:0.9.0:test (default-test) on project org.jboss.tools.drools.ui.bot.test: Error while executing platform
at org.apache.maven.lifecycle.internal.MojoExecutor.execute(MojoExecutor.java:141)
Does this test need more time? Can it be split into smaller pieces?
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: https://jira.jboss.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jbosstools-issues
mailing list