[jbosstools-issues] [JBoss JIRA] Commented: (JBIDE-8667) improve publishing of component sites using composite metadata so that content doesn't vanish and break downstream jobs

Nick Boldt (JIRA) jira-events at lists.jboss.org
Fri Aug 19 17:53:17 EDT 2011


    [ https://issues.jboss.org/browse/JBIDE-8667?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12622270#comment-12622270 ] 

Nick Boldt commented on JBIDE-8667:
-----------------------------------

OK, but the composite from which it pulls references BOTH the latest site (staging) and the previous site (staging.previous) so at any time you can get access to both PROVIDED that no more than 1 build happens while you're pulling bits. 

Worst case, you respin and you get the newer metadata, which points at the same sites but which resolves the x+1 and x versions instead of the x and x-1 versions.

--

Are you suggesting we need to have composite sites which point at SPECIFIC builds (possibly more than 2) rather than just staging + staging.previous?

> improve publishing of component sites using composite metadata so that content doesn't vanish and break downstream jobs
> -----------------------------------------------------------------------------------------------------------------------
>
>                 Key: JBIDE-8667
>                 URL: https://issues.jboss.org/browse/JBIDE-8667
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: Build/Releng
>    Affects Versions: 3.3.0.M1
>            Reporter: Nick Boldt
>            Assignee: Nick Boldt
>             Fix For: 3.3.0.M3
>
>         Attachments: screenshot103.png
>
>
> (2011-04-01 10:11:04) nickboldt: and while I'd love to do:
> (2011-04-01 10:11:12) nickboldt: mkdir whatever-new
> (2011-04-01 10:11:22) nickboldt: rsync newstuff whatever-new
> (2011-04-01 10:11:25) nickboldt: rm -fr whatever
> (2011-04-01 10:11:29) nickboldt: mv whatever-new whatever
> (2011-04-01 10:11:43) nickboldt: so that the time between "it's there" and "it's there and updated" is less
> (2011-04-01 10:11:52) nickboldt: I CANNOT with the current infra we have
> (2011-04-01 10:12:03) nickboldt: instead I can do an rsync --delete and push into the same folder on top
> (2011-04-01 10:12:16) nickboldt: but that means that the metadata will oft be out of whack w.r.t the site content
> (2011-04-01 10:12:17) maxandersen: hmmm
> (2011-04-01 10:12:41) nickboldt: if you can think of a way to do a "push then rename" instead of "push into existing and clean out cruft"
> (2011-04-01 10:12:51) nickboldt: over sftp via a script (non-interactive) then I'm all ears
> (2011-04-01 10:13:26) nickboldt: I can't push a script there and run it, or simply connect over ssh and run a script directly
> (2011-04-01 10:13:35) maxandersen: well what I was thinking was to do a push of new site into new dir, push site.xml/compositewhatever pointing to new dir and then rsync delete the existing one..
> (2011-04-01 10:14:10) maxandersen: sftp rm should work?
> (2011-04-01 10:14:13) nickboldt: MIGHT be able to do sftp delete
> (2011-04-01 10:14:39) maxandersen: if you control it with a composite artifact you dont need to rename anything
> (2011-04-01 10:14:51) maxandersen: except the content pointer in there which you know "locally"
> (2011-04-01 10:15:01) nickboldt: true... so I'd need a tool to do a one line swap in the composite*.xml files
> (2011-04-01 10:15:13) nickboldt: remove ref to old site, replace w/ ref to new site
> (2011-04-01 10:15:17) nickboldt: and then delete the old one
> 1. generate composite metadata files on the fly
> 2. publish that into root dir, all/repo/
> 3. purge previous build's folder over scripted sftp?

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

        


More information about the jbosstools-issues mailing list