[jbosstools-issues] [JBoss JIRA] Updated: (JBIDE-9576) Management polling / stop not working for EAP 6.
Andre Dietisheim (JIRA)
jira-events at lists.jboss.org
Wed Aug 24 09:21:17 EDT 2011
[ https://issues.jboss.org/browse/JBIDE-9576?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Andre Dietisheim updated JBIDE-9576:
------------------------------------
Steps to Reproduce:
#ASSERT: have a AS7 server adapter
#EXECUTE: launch it
#EXECUTE: stop it
Result:
The server process is killed, graceful stop does not work.
Eclipse log shows
{code}
!MESSAGE The server was shutdown forcefully. All processes were terminated.
{code}
There's no log entry in the server log that says that the server was shut down since it's process was just killed.
Expected result:
The server log has the following entry, that shows that the server was shut down gracefully
{code}
[org.jboss.as] JBoss EAP 6.0.0.Alpha1 (AS 7.0.0.Final) stopped in 3ms
{code}
> Management polling / stop not working for EAP 6.
> -------------------------------------------------
>
> Key: JBIDE-9576
> URL: https://issues.jboss.org/browse/JBIDE-9576
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: JBossAS
> Affects Versions: 3.3.0.M3
> Reporter: Rob Stryker
> Assignee: Andre Dietisheim
> Fix For: 3.3.0.M3
>
>
> Management poller never responds for EAP 6.
> Stopping the server simply terminates the process, instead of a graceful shutdown.
--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jbosstools-issues
mailing list