[jbosstools-issues] [JBoss JIRA] (JBDS-1970) Universal installer repeat step 4 of "Overal Installation progress" on every switch on the progress page
Dmitry Geraskov (Created) (JIRA)
jira-events at lists.jboss.org
Tue Dec 13 04:09:09 EST 2011
Universal installer repeat step 4 of "Overal Installation progress" on every switch on the progress page
--------------------------------------------------------------------------------------------------------
Key: JBDS-1970
URL: https://issues.jboss.org/browse/JBDS-1970
Project: Developer Studio (JBoss Developer Studio)
Issue Type: Bug
Security Level: Public (Everyone can see)
Components: installer
Affects Versions: 5.0.0.M5
Environment: Windows XP, jbdevstudio-product-eap-universal-5.0.0.v201112111508M-H55-M5
Reporter: Dmitry Geraskov
Assignee: Denis Golovin
Priority: Critical
1. Run installer with EAP
2. Install jbds and press next
3. On page "Create Shortcut" go back to the progress page
FAILURE: Installer repeat step 4/4 of "Overal Installation progress"
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.jboss.org/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jbosstools-issues
mailing list