[jbosstools-issues] [JBoss JIRA] Created: (JBIDE-9350) Ensure a poller can poll once as part of the interface

Rob Stryker (JIRA) jira-events at lists.jboss.org
Fri Jul 15 05:44:23 EDT 2011


Ensure a poller can poll once as part of the interface
------------------------------------------------------

                 Key: JBIDE-9350
                 URL: https://issues.jboss.org/browse/JBIDE-9350
             Project: Tools (JBoss Tools)
          Issue Type: Task
          Components: JBossAS
    Affects Versions: 3.3.0.M2
            Reporter: Rob Stryker
            Assignee: Rob Stryker
             Fix For: 3.3.0.M3


Currently the poll thread and interfaces "launch" a poller, and periodically check on it and its progress. The pollers should add an interface or an interface method to ensure one synchronous poll can be executed. 

Not all pollers can actually do this (timeout poller, process terminated poller, etc) so this should most likely be committed as a second interface. 

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

        


More information about the jbosstools-issues mailing list