[jbosstools-issues] [JBoss JIRA] Issue Comment Edited: (JBIDE-9048) VPE build + tests takes over 4hrs to run

Yahor Radtsevich (JIRA) jira-events at lists.jboss.org
Wed Jun 1 15:59:01 EDT 2011


    [ https://issues.jboss.org/browse/JBIDE-9048?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12605886#comment-12605886 ] 

Yahor Radtsevich edited comment on JBIDE-9048 at 6/1/11 3:57 PM:
-----------------------------------------------------------------

*Marked as a duplicate of* JBIDE-8777.
Let's move our discussion there.

      was (Author: yradtsevich):
    *Marked as a duplicate of JBIDE-8777.*
Let's move our discussion there.
  
> VPE build + tests takes over 4hrs to run
> ----------------------------------------
>
>                 Key: JBIDE-9048
>                 URL: https://issues.jboss.org/browse/JBIDE-9048
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: Visual Page Editor core
>    Affects Versions: 3.3.0.M2
>            Reporter: Nick Boldt
>            Assignee: Yahor Radtsevich
>             Fix For: 3.3.0.M3
>
>
> Since May 26 (when I ran this job w/ tests disabled), VPE build takes over 4hrs to run.
> http://hudson.qa.jboss.com/hudson/view/DevStudio/view/DevStudio_Trunk/portlet/dashboard_portlet_24/job/jbosstools-3.3_trunk.component--vpe/buildTimeTrend
> We used to have 219 tests; now we have only 11 (perhaps because they take too long, they timeout and fail).
> Could the long-running integration tests be split out from the short-running junits / bot tests?
> http://devstudio.pad.engineering.redhat.com/4
> Or is a better solution to build & publish in this job, THEN run tests as a downstream job (or downstream job config within the same job, if we don't care about multiplatform testing) ?

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

        


More information about the jbosstools-issues mailing list