[jbosstools-issues] [JBoss JIRA] (JBIDE-10028) JBoss Central Editor Maximize/Restore actions freeze UI and loads CPU

Radim Hopp (Closed) (JIRA) jira-events at lists.jboss.org
Tue Nov 1 06:05:45 EDT 2011


     [ https://issues.jboss.org/browse/JBIDE-10028?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Radim Hopp closed JBIDE-10028.
------------------------------



Verified in JBT 3.3.0.M4a
                
> JBoss Central Editor Maximize/Restore actions freeze UI and loads CPU
> ---------------------------------------------------------------------
>
>                 Key: JBIDE-10028
>                 URL: https://issues.jboss.org/browse/JBIDE-10028
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: central
>    Affects Versions: 3.3.0.M4
>         Environment: Linux GTK x86
>            Reporter: Denis Golovin
>            Assignee: Snjezana Peco
>            Priority: Blocker
>             Fix For: 3.3.0.M4
>
>         Attachments: animatedgif.patch, projectExamples.patch, projectExamples1.patch, stacktrace.txt
>
>
> After any operation related to Maximize/Restore UI is freezes for noticeable time, one CPU is loaded 100% and after some time OS ask about killing eclipse window. After any EXEC: step in test case UI is freezes. Always reproducible.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.jboss.org/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        


More information about the jbosstools-issues mailing list