[jbosstools-issues] [JBoss JIRA] Closed: (JBIDE-9649) Timeout problem with JBoss 7.0.1.Final
Rastislav Wagner (JIRA)
jira-events at lists.jboss.org
Fri Sep 9 04:19:26 EDT 2011
[ https://issues.jboss.org/browse/JBIDE-9649?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Rastislav Wagner closed JBIDE-9649.
-----------------------------------
verified in JBDS 5.0.0.v201109071858R-H28-M3
> Timeout problem with JBoss 7.0.1.Final
> --------------------------------------
>
> Key: JBIDE-9649
> URL: https://issues.jboss.org/browse/JBIDE-9649
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: JBossAS/Servers
> Affects Versions: 3.3.0.M2
> Environment: Ubuntu 11.04 (x86_64)
> Java(TM) SE Runtime Environment (build 1.7.0-b147)
> Eclipse 3.7 (Build id: 20110615-0604) with WTP 3.3
> JBossAS Tools 2.3.0.v20110624-0505-H8-M2 and 2.3.0.v20110829-0855-H677-M3
> Reporter: Tobias Koltsch
> Assignee: Rob Stryker
> Labels: as7, timeout
> Fix For: 3.3.0.M3, 3.3.0.M4
>
>
> When I start my JBoss with JBossAS tools inside of my eclipse, the server start correctly and prints out the message "JBoss AS 7.0.1.Final "Zap" started in 2073ms - Started 98 of 153 services (55 services are passive or on-demand)". The start timeout is configured with 10 seconds. It seems eclipse didn't notice the server is started, and after 10 seconds I got the error message: „Starting JBoss 7.0.1.Final has encountered a problem. Server JBoss 7.0.1.Final Server failed to start".
> With JBoss 7.0.0.Final the timeout work correctly and I got the error only when I use JBoss 7.0.1.Final.
> I got this error with the developer milestone 2.3.0.v20110624-0505-H8-M2 as well as with the latest nightly build 2.3.0.v20110829-0855-H677-M3
--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jbosstools-issues
mailing list