[jbosstools-issues] [JBoss JIRA] (JBIDE-11200) Forge process fails to stop
Koen Aers (JIRA)
jira-events at lists.jboss.org
Mon Mar 19 05:20:47 EDT 2012
[ https://issues.jboss.org/browse/JBIDE-11200?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12677570#comment-12677570 ]
Koen Aers commented on JBIDE-11200:
-----------------------------------
AFAIR there is a listener attached to the workbench listening for shutdown, but I can also see this behavior. As a matter of fact, I have seen the same behavior with JBoss AS instances that were launched from JBoss Tools. Maybe something changed in how the workbench notifies shutdown. I'll investigate.
> Forge process fails to stop
> ---------------------------
>
> Key: JBIDE-11200
> URL: https://issues.jboss.org/browse/JBIDE-11200
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: forge
> Environment: beta1b and beta1c
> Reporter: Burr Sutter
> Assignee: Koen Aers
> Priority: Critical
> Fix For: 3.3.0.Beta3
>
>
> jps revealed that I had several Forge processes running though I had no JBDS processes running. Forge had been run several times during Tue & Wed but JBDS had been completely re-installed yet I had Forge processes still living in the background. kill -9 was used to shoot those zombies. :-)
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.jboss.org/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jbosstools-issues
mailing list