[jbosstools-issues] [JBoss JIRA] (JBIDE-12516) Add m2e 1.2 RC to our TP + requirements + usual stuff

Nick Boldt (JIRA) jira-events at lists.jboss.org
Fri Sep 7 12:32:33 EDT 2012


    [ https://issues.jboss.org/browse/JBIDE-12516?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12716712#comment-12716712 ] 

Nick Boldt edited comment on JBIDE-12516 at 9/7/12 12:31 PM:
-------------------------------------------------------------

Pulled new mirror of m2e 1.2.0.20120903-1050, m2e-wtp 0.16.0.20120830-0951, and the usual m2e-* stuff (apt, jdt, archiver, etc).

http://download.jboss.org/jbosstools/updates/requirements/m2eclipse/20120905-1550/

Included in SR0a composite:

http://download.jboss.org/jbosstools/updates/juno/SR0a/

--

If you need something newer in time for Alpha2 code freeze, let me know.

Otherwise please leave this on your pile until there's newer versions you want included in the TP/requirements.

I'll be pulling an update to Juno reqs after Juno SR1 is done (between Oct 5 and 12) so we have new (final?) stuff in time for the Beta1 code freeze on Oct 12.

                
      was (Author: nickboldt):
    Pulled new mirror of m2e 1.2.0.20120903-1050, m2e-wtp 0.16.0.20120830-0951, and the usual m2e-* stuff (apt, jdt, archiver, etc).

http://download.jboss.org/jbosstools/updates/requirements/m2eclipse/20120905-1550/

Included in SR0a composite:

http://download.jboss.org/jbosstools/updates/juno/SR0a/
                  
> Add m2e 1.2 RC to our TP + requirements + usual stuff
> -----------------------------------------------------
>
>                 Key: JBIDE-12516
>                 URL: https://issues.jboss.org/browse/JBIDE-12516
>             Project: Tools (JBoss Tools)
>          Issue Type: Task
>          Components: Build/Releng
>    Affects Versions: 4.0.0.Alpha1
>            Reporter: Fred Bricon
>            Assignee: Fred Bricon
>             Fix For: 4.0.0.Alpha2
>
>
> m2e 1.2 RC (1.2.0.20120828-2132) has been made publicly available from http://download.eclipse.org/technology/m2e/milestones/1.2
> It's expected this build will be promoted as the final 1.2 release on sept 28th. 
> I've been testing it for a while and think it's ready for being added to our TP / requirements site

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira


More information about the jbosstools-issues mailing list