[jbosstools-issues] [JBoss JIRA] (JBIDE-14028) Usage tests freeze on Kepler M6
Andre Dietisheim (JIRA)
jira-events at lists.jboss.org
Mon Apr 15 14:21:53 EDT 2013
[ https://issues.jboss.org/browse/JBIDE-14028?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12767338#comment-12767338 ]
Andre Dietisheim commented on JBIDE-14028:
------------------------------------------
This issue is for fixing Alpha2 and the PR here (https://github.com/jbosstools/jbosstools-base/pull/84) is providing the minimal changes that fix Alpha2:
prevent tycho/surefire from running the test in UIHarness/UIThread
> Usage tests freeze on Kepler M6
> -------------------------------
>
> Key: JBIDE-14028
> URL: https://issues.jboss.org/browse/JBIDE-14028
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: usage
> Affects Versions: 4.1.0.Alpha1, 4.1.0.Alpha2
> Reporter: Andre Dietisheim
> Assignee: Snjezana Peco
> Fix For: 4.1.0.Alpha2
>
>
> The usage tests freezes because they are executed before calling the UsageReportEnablementDialog dialog.
> They set the "usage_reporting_enabled" property to true which enables opening the UsageReportEnablementDialog dialog.
> The fix is to set usage_reporting_enabled=false after the latest test (UsageIntegrationTest).
> The issue happens on Kepler M6. I suppose it is caused by some changes related to the handling UI messagess/jobs.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jbosstools-issues
mailing list