[jbosstools-issues] [JBoss JIRA] (JBIDE-16286) CDI builder (not import, workspace rebuild) is very slow in wildfly

Andre Dietisheim (JIRA) issues at jboss.org
Wed Dec 18 16:43:32 EST 2013


    [ https://issues.jboss.org/browse/JBIDE-16286?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12932514#comment-12932514 ] 

Andre Dietisheim edited comment on JBIDE-16286 at 12/18/13 4:42 PM:
--------------------------------------------------------------------

In my initial Eclipse, the build is still very slow. It's configuration is:

* Kepler Service Release 1, Build id: 20130919-0819
* m2e: org.eclipse.m2e.core_1.5.0.20131218-1213
* cdi: org.jboss.tools.cdi.core_1.6.0.Alpha1-v20131214-0017-B524

Even after switching to new workspace this Eclipse is very slow in building.
I attached it's full plugin-listing
                
      was (Author: adietish):
    In my initial Eclipse, the build is still very slow. It's configuration is:

* Kepler Service Release 1, Build id: 20130919-0819
* m2e: org.eclipse.m2e.core_1.5.0.20131218-1213
* cdi: org.jboss.tools.cdi.core_1.6.0.Alpha1-v20131214-0017-B524
                  
> CDI builder (not import, workspace rebuild) is very slow in wildfly
> -------------------------------------------------------------------
>
>                 Key: JBIDE-16286
>                 URL: https://issues.jboss.org/browse/JBIDE-16286
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: cdi
>    Affects Versions: 4.1.1.Final
>            Reporter: Andre Dietisheim
>            Assignee: Viacheslav Kabanovich
>            Priority: Critical
>              Labels: performance
>             Fix For: 4.1.2.Final, 4.2.0.Alpha2
>
>         Attachments: cdi-builder.ogv, cleanBuild.png, maven-preferences-hide-children.png, thread-dump-7_05.txt, thread-dump-7_19.txt, updatingPom.png, VisualVM 1.3.2 _083.png
>
>
> When working in a wildfly workspace with all wildfly projects imported and CDI builder enabled, workspace rebuilds (that you trigger by changing poms and then do maven update project) are a lot slower than without it. Re-building the whole workspace can easily take up to 20 minutes for me.
> Hard to give more general purpose details, I did a quick screencast to give an impression how slow things are for me.
> [^cdi-builder.ogv]

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira


More information about the jbosstools-issues mailing list