[jbosstools-issues] [JBoss JIRA] (JBIDE-13150) When started using "java", Failing Central install shows no UI
Radim Hopp (JIRA)
jira-events at lists.jboss.org
Tue Feb 12 09:58:56 EST 2013
[ https://issues.jboss.org/browse/JBIDE-13150?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Radim Hopp closed JBIDE-13150.
------------------------------
> When started using "java", Failing Central install shows no UI
> --------------------------------------------------------------
>
> Key: JBIDE-13150
> URL: https://issues.jboss.org/browse/JBIDE-13150
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: central, testing
> Affects Versions: 4.1.0.Alpha1
> Reporter: Mickael Istria
> Assignee: Mickael Istria
> Priority: Minor
> Fix For: 4.1.0.Alpha1
>
>
> This was discovered while trying to debug some Installation Tests. We start Eclipse that way: https://github.com/jbosstools/jbosstools-install-grinder/blob/master/scripts/src/main/groovy/testInstall.groovy#L96 (java -jar ... -product ... -application org.eclipse.swtbot.swtbottestapplication -testProduct ... -testApplication ...).
> When running SWTBot to perform tests that install all Software from Central, when those are failing due to bad p2 plan; then there is no pop-up to warn about failing plan.
> When starting Eclipse normally, we can see a pop-up telling which "Problems occured".
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jbosstools-issues
mailing list